Projects | TLS-based Multi-Sensor-Systems
-
Monitoring a track warping testGIH was responsible for the metrological monitoring of a very unusual test conducted by Deutsche Bahn - a track warping test. A previously selected rail area was heated to a very high temperature, which initially caused the rail to deform and then warp. This track warping test took place in June 2017 in southern Lower Saxony.Led by: Ingo Neumann, Jens-André PaffenholzTeam:Year: 2017Duration: 05/2017 - 12/2017
© GIH / U. Stenz